    Introduction of Station Facilities

    Introduction of Station Facilities

    Subway Lines 1~4 has a total of 120 stations (Line 1 has 10, Line 50, Line 3 has 34 and 4 has 26) and five train depots (Gunja, Shinjeung, Jichuk, Suseo and Changdong). The maintenance of architectural facilities are carried out by a construction company and one team from the Head Office. The maintenance of architectural facilities is carried out as stated in the Special Law for Safety Supervision by internal and external inspection institutions. Mid-and long-term maintenance plans are made with the results of these inspections. Daily checkups (assignment sections) are carried out at the architectural facilities of all 120 stations and five depots to set up short-term maintenance plans and ensure the safety of passengers.

     

    Construction and Investment

    Construction and Investment
    Classification Total Line1 Line2 Line3 Line4
    Section 4Routes Seoul Station
    ¡ê
    Chungryangri
    Seongsu
    ¡ê
    Seongsu
    Jichuk
    ¡ê
    Ogeum
    Danggogae
    ¡ê
    Namtaeryeong
    Extension Operation
    Distance
    137.9km 7.8 60.2 38.2 31.7
    Entire
    Sections
    146.1km 9.9 62.1 40.7 33.4
    No.of Stations 120 Stations 10 50 34 26
    Investment 30,774billion
    won
    ('71~'05)
    984
    ('71~'05)
    11,171
    ('78~'05)
    10,304
    ('80~'93)
    8,315
    ('80~'94)
     

    Shutter Status

    Shutter Status
    Classification Total By Line Train
    Depot
    Sub-total Line1 Line2 Line3 Line4
    Total 1,130 1,015 125 449 214 227 115
    Types Auto 960 845 108 389 170 178 115
    Manual 156 156 13 58 41 44 -
    Spring 14 14 4 2 3 5 -
    Arson 50 45 6 14 13 12 5
     

    Restroom Status

    Restroom Status
    Classification Total Line1 Line2 Line3 Line4
    Grand Total 268 17 126 77 48
    For Passengers Men
    Women
    The Disabled
    135
    135
    127
    14
    14
    12
    57
    57
    55
    34
    34
    31
    30
    30
    29
    For
    Employees
    Sub-total 135 3 69 45 1
    Station 19 3 6 6 4
    Train Depot
    (Women)
    117
    (48)
    -
    (-)
    64
    (22)
    39
    (20)
    14
    (6)
     

    Floorage Status

    Floorage Status
    Classification Total Line1 Line2 Line3 Line4
    Total 957,462 87,594 385,764 263,400 220,704
    Waiting Room 581,644 55,740 238,954 158,201 128,795
    Platform 301,153 30,007 136,137 71,920 63,237
    Others 74,665 1,847 10,867 33,279 28,672
     

    Platform shape and station building structure

    Platform shape and station building structure
    Classification Total Line1 Line2 Line3 Line4
    Platform
    shape
    Total 120 10 50 34 26
    Island 38 2 10 17 9
    Separate 82 8 40 17 17
    Station
    building
    structure
    Total 120 10 50 34 26
    Underground 100 10 37 32 21
    Elevated,
    ground
    20 - 13 2 5